top of page
Offshore oil rig with a large platform

HYDRAULIC SYSTEMS – BESPOKE OFFSHORE SOLUTIONS, FALMOUTH

Customised offshore hydraulic systems. ISO 9001:2000 accredited. Global project expertise.

WHAT SETS US APART

TAILORED HYDRAULIC SYSTEMS FOR OFFSHORE NEEDS

We design and deliver customised hydraulic solutions for offshore oil, gas, and renewable energy installations.

GLOBAL DEPLOYMENT FOR URGENT PROJECTS

Our expert teams provide rapid international deployment to support critical offshore operations and minimise operational downtime.

30+ YEARS OF INDUSTRY EXPERTISE

Decades of experience ensure safe, efficient, and reliable hydraulic solutions for complex offshore energy environments.

CRUCIAL HYDRAULIC SYSTEMS FOR THE OIL AND GAS INDUSTRY

Using hydraulic systems to transmit power is critical to the way that the oil and gas industry operates.
We are experts at designing the highly complex hydraulic systems and components that the oil and gas industry needs, and we have installed these for customers around the world.


We can also provide a range of vital hydraulic equipment, such as hydraulic pumps and valves, well head control systems, flushing systems, belt conveyors, winches and hoists. All of our equipment is precision-engineered and tested to the very high standards that these industries need.


The superb efficiency and reliability of our solutions help you to maximise productivity from these expensive installations, while minimising downtime and reducing the need for unplanned maintenance or repairs.

Looking up at an oil rig structure against a clear blue sky
Oil drilling rig operation on the oil platform

WHY CHOOSE ARMADA ENGINEERING LTD?

These projects demonstrate how Armada Engineering Ltd can bring its unique technical ability to bear on a range of tough challenges. They also help explain why Armada’s work is attracting more and more interest from clients in the renewable energy industry.

ESSENTIAL SERVICES TO THE RENEWABLE ENERGY INDUSTRY

Armada Engineering Ltd has been commissioned to carry out a number of pioneering projects in this field.
Armada was involved in setting up the very first tidal arrays in the UK, located off the coast of Scotland. Here, Armada Engineering was responsible for building the massive powerpacks for Rolls-Royce Tidal Generation that are at the heart of this facility.
For the construction of the huge Westermost Rough offshore wind farm, situated in the North Sea, Armada’s hydraulic expertise played a crucial role. Armada Engineering designed and built the hydraulics for the upending buckets, which were needed to lift these huge 177m tall structures into position. This was the first time that hydraulics had been used in this way on a wind farm construction project of this scale.
Armada also designed and built a hydraulic-powered test rig for a prototype 500 kW tidal turbine, which needed to be trialled in Orkney before being deployed at sea. You can see the full case study on this project.

SPECIALISED OFFSHORE HYDRAULIC SOLUTIONS

With offshore oil and gas installations, hydraulic systems have to operate at very high pressures and flow rates. Any fault in design can lead to a leak of fluids, potentially causing damage to sensitive marine environments. That’s why we build carefully engineered, robust systems that are highly reliable and designed to operate effectively in very harsh conditions.
Our outstanding hydraulic engineering skills mean that we are often called in by oil and gas clients to troubleshoot urgent technical issues and problems. Our response team is able to travel to any location in the world at short notice. They will work alongside your own teams to find and implement the solution, so that you can return to full operating capacity as quickly as possible.

OPTIMISE YOUR OFFSHORE OPERATIONS

Call now to discuss your hydraulic system needs!

CONTACT US

Spain - 34 937609247

Armada Engineering Ltd​

Falmouth (UK) Address :

Unit 3 Bickland Industrial Park, 
Falmouth, Cornwall, TR11 4TA

Barcelona (Spain) Address :

Marina Barcelona 92, Passeig Joan de Borbo, 92,
Barcelona, Spain, 08039

BUSINESS HOURS

Monday – Friday: 08:00 - 16:30
Saturday – Sunday: Closed

European Union
European Regional
Development Fund logo
ISO 9001 CERTIFIED logo
Review us on Yell logo
  • Facebook
  • X
  • Google business W

Armada Engineering Limited, registered as a limited company in England and Wales under company number: 02454710.
Registered Company Address: Unit 3 Bickland Industrial Park, Falmouth, Cornwall, England, TR11 4TA.

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2025. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page